Monday, 5 February 2024

 Cockpit sides and cockpit floor filleted in,
Watertight hatches in progress, 


the cockpit sides and floor were final coated, then the framing was precoated with unthickened epoxy and then they were bonded in with thickened epoxy and screwed in as well, fillets were then added, 


cockpit floor framing pre-coated




the underside of the cockpit floor with its epoxy coats was precoated where the epoxy glue is to be added




starboard side done

port side done


Bow flotation bulkhead hatch and above it is the mast bulkhead (will be watertight) hatch




No comments:

Post a Comment

 NMEA connections and the low power interior lights Just some futher pictures from the last few weeks all the NMEA connections are contained...