Sunday, 14 January 2024

Prep work for second epoxy coat and
second coat under bunk tops


sanded the underside of the bunk tops


 and gave them a second epoxy coat -



all 4 are complete now and are ready to be bonded in


also sanded the bow and the cargo compartment in preparation of giving them a second coat




No comments:

Post a Comment

 NMEA connections and the low power interior lights Just some futher pictures from the last few weeks all the NMEA connections are contained...