Tuesday, 25 April 2023

 The stem is placed


I had some things that needed to be clarified before building could carry on. Today the stem was placed, It sometimes is needed to do some traditional methods to build something




because the laser level was so close to the stem and at the KWL it did not project down far enough to check plumb. Plumb bob to the rescue




No comments:

Post a Comment

A round the world non stop record challenge  in a modified 5.8m Class Globe  Alessio Campriani is busy with his challenge at the smallest bo...