Friday, 28 April 2023

 The next lot of stringers ready to be placed


The 50mm stringers were scarfed and glued today and are ready to be placed, this operation was done inside the house as the workshop was being used to place the 30mm stringers. Also they were able to glue, without being disturbed, it is warmer and the cat could check them for quality.

No comments:

Post a Comment

Working on all the small details, watertight seals, deck layout, and Hard Dodger version 3.0 or 4.0 but most probably version 4.9.7.3. and m...