Sunday, 19 November 2023

 intermediate deck beams glued and filleted in



the main cabin intermediate deck beam is glued and filleted in and has had a second gusset added as well as some 50mm x 22mm framing to carry forces and tie strongly to the sheerclamp 



the "cargo" area intermediate deck beam has had a single gusset and some 40mm x 22mm framing added as well as some structural filleting 

No comments:

Post a Comment

Working on all the small details, watertight seals, deck layout, and Hard Dodger version 3.0 or 4.0 but most probably version 4.9.7.3. and m...