cabin side stringers
they have been glued in and filleted
The bow watertight flotation bulkhead hatch was also prepped and glued
Working on all the small details, watertight seals, deck layout, and Hard Dodger version 3.0 or 4.0 but most probably version 4.9.7.3. and m...
No comments:
Post a Comment