The build continues. Preparing for stringers


Today all dimensions and levels were finally checked, and the hull was stabilized and the dimensions between frames checked to be equal, tomorrow the first of the stringers will be placed.






Tuesday, 25 April 2023

 The stem is placed


I had some things that needed to be clarified before building could carry on. Today the stem was placed, It sometimes is needed to do some traditional methods to build something




because the laser level was so close to the stem and at the KWL it did not project down far enough to check plumb. Plumb bob to the rescue




Thursday, 20 April 2023

 Putting in the sloping frame

today was spent putting in the sloping frame at a 60 degree angle, checking dimensions and stations and bracing the frames