Saturday, 30 March 2024

 Deck glassing - from earlier this week








first layer on cabin side and hull joint




second hullside layer and single deck layer under peelply


the cabin side and hull joint got a double layer of glass,
easier to fair than a single layer (and adding fairing compound between the strengthening tapes) and stronger IMHO than fairing filler/microballoons and glass tape. 
Deck got single layer of glass.




deck is now completely glassed



No comments:

Post a Comment

Working on all the small details, watertight seals, deck layout, and Hard Dodger version 3.0 or 4.0 but most probably version 4.9.7.3. and m...