Friday, 3 March 2023

 Frame B and Transom glued up


Pre wetting out the end grain and the framing and the ply gussets with unthickend epoxy and then adding the correct fillers - fumed silica, west 403 and 404 to make a bonding adhesive and then gluing and then cleaning up really took a lot of time, so tomorrow the bulkheads of E and D will be glued, the bright side is all the framing is done.


No comments:

Post a Comment

Manual bilge pump finally installed The manual hand bilge pump - a whale MK 5  which is a 65litre/min bilge pump has finally been fitted  - ...