Monday, 8 January 2024

Sunday, 7 January 2024

 epoxy coating complete


The coating of the assembled structure has been completed , 
there are a few uninstalled cockpit panels that still need to be coated, 
and of course the deck














Friday, 5 January 2024

Replaced the Blocks with a low friction cascade on the boom vang I am always looking at better ways to optimize things and seeing as I had s...