Sunday, 11 June 2023

Sides on , sides planed  and butt blocks installed ,
Ready for the bottom panels


roughly cut and then planed


all planed smooth




Today the chine panels were planed down, this entailed removing the the stainless screws are they were above where the plane was cutting, and yes my plane cuts stainless screws, but only once, I had to do a major plane iron sharpening session, the buttblocks were cut , drilled countersunk and glued and screwed onto the joins, buttblock width 16 times the plywood thickness as per the Gougeon brothers book, I add buttblocks  after fitting the panels as it makes for a better  fair curve to the panels  - no flat spots, the panels when fitted had epoxy saturation on the end grain and were also edge butt glued, then later the butt blocks are glued with lots of thickened epoxy and also screwed.



butt blocks cut ready for drilling and countersinking


The hull panel join before being butt blocked, the backing plate for the shrouds ends up at this hull panel joint as well so the shroud backing plate has a big backing plate (the buttblock),shroud backing blocks are specced as being 2x10mm ply  - one layer (the buttblock) now one will be wider than on the drawing. so will give the shroud backing block a bigger  area to glue to.

The hull is now ready for the first layer of bottom ply, which will be cut tomorrow and fitted





Monday, 5 June 2023

 Marking the waterline


Remembering to mark the waterline while some of the marks on the frames are
still visible before they got covered with hull panels



 NMEA connections and the low power interior lights Just some futher pictures from the last few weeks all the NMEA connections are contained...