Monday, 13 March 2023

 Rudder Transom and clean up all frames


Today the remaining 2 pieces of the rudder were glued-up - tomorrow the 2 pieces each of 2 pieces will be glued together, so in total 4 layers of ply in the rudders,



also 2 small backing blocks were glued in the transom, not totally needed but was in the plans for the centreboard version, 2 little blocks  of extra, stiffness and strength.



 and ALL the frames were cleaned up so that the plywood bulkheads are flush with the frames,

 just a few pieces of framing to glue onto the companionway bulkhead and the A frame for a cockpit floor support and then all frame/bulkheads are complete

- till tomorrow  - 
até amanhã

Saturday, 11 March 2023

 Rudder Glue-up

Today 2 pieces of the rudder were glued - up ,
first the ply was saturated with epoxy then a high strength glue mix was added
and they were clamped up.











Rudder ready for glue up 

today the rudder dimensions were double checked and checked again, then a master was cut out and 3 more rudder pieces were duplicated, then they were abraded in preparation for glue up.






 NMEA connections and the low power interior lights Just some futher pictures from the last few weeks all the NMEA connections are contained...